infrastructure_id
stringlengths
11
11
type
stringclasses
3 values
name
stringlengths
15
46
state
stringclasses
37 values
voltage_kv
float64
33
500
⌀
length_km
float64
20
200
⌀
commissioning_year
int64
1.98k
2.02k
status
stringclasses
4 values
capacity_mva
float64
31.7
500
⌀
plant_type
stringclasses
4 values
capacity_mw
float64
17.6
488
⌀
INFRA-00001
transmission_line
Abia Transmission Line 1
Abia
500
187
1,990
operational
null
null
null
INFRA-00002
transmission_line
Abia Transmission Line 2
Abia
500
39.1
1,985
operational
null
null
null
INFRA-00003
transmission_line
Abia Transmission Line 3
Abia
330
133.1
1,994
operational
null
null
null
INFRA-00004
transmission_line
Abia Transmission Line 4
Abia
132
109.9
2,012
operational
null
null
null
INFRA-00005
transmission_line
Abia Transmission Line 5
Abia
500
65.3
1,997
operational
null
null
null
INFRA-00006
transmission_line
Abia Transmission Line 6
Abia
132
175.9
2,010
operational
null
null
null
INFRA-00007
transmission_line
Abia Transmission Line 7
Abia
500
44
2,023
operational
null
null
null
INFRA-00008
transmission_line
Abia Transmission Line 8
Abia
132
38.6
2,017
operational
null
null
null
INFRA-00009
transmission_line
Abia Transmission Line 9
Abia
330
115.1
2,020
operational
null
null
null
INFRA-00010
transmission_line
Abia Transmission Line 10
Abia
132
136.9
2,018
operational
null
null
null
INFRA-00011
transmission_line
Abia Transmission Line 11
Abia
132
33.6
2,006
operational
null
null
null
INFRA-00012
transmission_line
Abia Transmission Line 12
Abia
500
44.4
2,017
operational
null
null
null
INFRA-00013
transmission_line
Abia Transmission Line 13
Abia
330
194.5
2,011
operational
null
null
null
INFRA-00014
substation
Abia Substation 1
Abia
330
null
2,013
under_maintenance
298.9
null
null
INFRA-00015
substation
Abia Substation 2
Abia
132
null
1,988
operational
190.3
null
null
INFRA-00016
substation
Abia Substation 3
Abia
33
null
2,017
planned
467.4
null
null
INFRA-00017
substation
Abia Substation 4
Abia
330
null
2,005
operational
370.9
null
null
INFRA-00018
substation
Abia Substation 5
Abia
132
null
2,011
operational
488.5
null
null
INFRA-00019
substation
Abia Substation 6
Abia
330
null
1,985
operational
333.8
null
null
INFRA-00020
power_plant
Abia Gas Plant 1
Abia
null
null
1,990
decommissioned
null
gas
135
INFRA-00021
power_plant
Abia Gas Plant 2
Abia
null
null
1,991
under_maintenance
null
gas
29.6
INFRA-00022
power_plant
Abia Hydro Plant 3
Abia
null
null
1,994
under_maintenance
null
hydro
235.1
INFRA-00023
transmission_line
Adamawa Transmission Line 1
Adamawa
132
190.4
1,991
operational
null
null
null
INFRA-00024
transmission_line
Adamawa Transmission Line 2
Adamawa
132
31.9
1,985
under_maintenance
null
null
null
INFRA-00025
transmission_line
Adamawa Transmission Line 3
Adamawa
500
106
2,005
operational
null
null
null
INFRA-00026
transmission_line
Adamawa Transmission Line 4
Adamawa
132
145.9
2,023
operational
null
null
null
INFRA-00027
transmission_line
Adamawa Transmission Line 5
Adamawa
132
42.5
1,995
operational
null
null
null
INFRA-00028
transmission_line
Adamawa Transmission Line 6
Adamawa
132
45.1
2,010
under_maintenance
null
null
null
INFRA-00029
substation
Adamawa Substation 1
Adamawa
330
null
1,986
operational
262.2
null
null
INFRA-00030
substation
Adamawa Substation 2
Adamawa
132
null
2,022
under_maintenance
265.5
null
null
INFRA-00031
substation
Adamawa Substation 3
Adamawa
330
null
2,017
operational
195.4
null
null
INFRA-00032
substation
Adamawa Substation 4
Adamawa
132
null
2,005
operational
77.9
null
null
INFRA-00033
substation
Adamawa Substation 5
Adamawa
132
null
2,013
operational
314.7
null
null
INFRA-00034
substation
Adamawa Substation 6
Adamawa
330
null
1,994
operational
351.4
null
null
INFRA-00035
power_plant
Adamawa Gas Plant 1
Adamawa
null
null
2,011
decommissioned
null
gas
102.2
INFRA-00036
power_plant
Adamawa Gas Plant 2
Adamawa
null
null
2,017
operational
null
gas
71.2
INFRA-00037
transmission_line
Akwa Ibom Transmission Line 1
Akwa Ibom
132
71.1
2,006
operational
null
null
null
INFRA-00038
transmission_line
Akwa Ibom Transmission Line 2
Akwa Ibom
330
99.3
2,022
operational
null
null
null
INFRA-00039
transmission_line
Akwa Ibom Transmission Line 3
Akwa Ibom
500
143.6
2,021
operational
null
null
null
INFRA-00040
transmission_line
Akwa Ibom Transmission Line 4
Akwa Ibom
132
42.7
1,981
operational
null
null
null
INFRA-00041
transmission_line
Akwa Ibom Transmission Line 5
Akwa Ibom
132
131.6
2,002
operational
null
null
null
INFRA-00042
transmission_line
Akwa Ibom Transmission Line 6
Akwa Ibom
132
39
1,982
operational
null
null
null
INFRA-00043
transmission_line
Akwa Ibom Transmission Line 7
Akwa Ibom
330
131.3
1,981
operational
null
null
null
INFRA-00044
transmission_line
Akwa Ibom Transmission Line 8
Akwa Ibom
330
170.2
1,991
operational
null
null
null
INFRA-00045
transmission_line
Akwa Ibom Transmission Line 9
Akwa Ibom
500
191.1
1,999
operational
null
null
null
INFRA-00046
substation
Akwa Ibom Substation 1
Akwa Ibom
33
null
2,014
operational
233
null
null
INFRA-00047
substation
Akwa Ibom Substation 2
Akwa Ibom
330
null
1,995
operational
364.7
null
null
INFRA-00048
substation
Akwa Ibom Substation 3
Akwa Ibom
33
null
1,985
operational
460
null
null
INFRA-00049
power_plant
Akwa Ibom Solar Plant 1
Akwa Ibom
null
null
2,005
operational
null
solar
488.3
INFRA-00050
transmission_line
Anambra Transmission Line 1
Anambra
500
48.2
2,013
operational
null
null
null
INFRA-00051
transmission_line
Anambra Transmission Line 2
Anambra
500
108.8
1,983
operational
null
null
null
INFRA-00052
transmission_line
Anambra Transmission Line 3
Anambra
500
49.8
1,990
operational
null
null
null
INFRA-00053
transmission_line
Anambra Transmission Line 4
Anambra
500
183.1
2,002
operational
null
null
null
INFRA-00054
transmission_line
Anambra Transmission Line 5
Anambra
500
184.8
1,986
operational
null
null
null
INFRA-00055
substation
Anambra Substation 1
Anambra
33
null
1,999
operational
78.6
null
null
INFRA-00056
substation
Anambra Substation 2
Anambra
330
null
1,988
operational
109.3
null
null
INFRA-00057
substation
Anambra Substation 3
Anambra
33
null
2,012
operational
474.5
null
null
INFRA-00058
substation
Anambra Substation 4
Anambra
330
null
2,020
operational
172.8
null
null
INFRA-00059
substation
Anambra Substation 5
Anambra
33
null
2,003
operational
271.9
null
null
INFRA-00060
power_plant
Anambra Gas Plant 1
Anambra
null
null
1,993
decommissioned
null
gas
73.9
INFRA-00061
power_plant
Anambra Solar Plant 2
Anambra
null
null
2,007
operational
null
solar
183.5
INFRA-00062
transmission_line
Bauchi Transmission Line 1
Bauchi
500
67.9
2,005
operational
null
null
null
INFRA-00063
transmission_line
Bauchi Transmission Line 2
Bauchi
500
45.3
2,010
under_maintenance
null
null
null
INFRA-00064
transmission_line
Bauchi Transmission Line 3
Bauchi
132
53
1,993
under_maintenance
null
null
null
INFRA-00065
transmission_line
Bauchi Transmission Line 4
Bauchi
500
60.7
1,999
operational
null
null
null
INFRA-00066
transmission_line
Bauchi Transmission Line 5
Bauchi
132
160.5
2,016
operational
null
null
null
INFRA-00067
transmission_line
Bauchi Transmission Line 6
Bauchi
132
97.4
1,991
operational
null
null
null
INFRA-00068
transmission_line
Bauchi Transmission Line 7
Bauchi
132
37.7
2,011
under_maintenance
null
null
null
INFRA-00069
transmission_line
Bauchi Transmission Line 8
Bauchi
132
191.5
2,021
operational
null
null
null
INFRA-00070
transmission_line
Bauchi Transmission Line 9
Bauchi
132
105.3
1,997
operational
null
null
null
INFRA-00071
substation
Bauchi Substation 1
Bauchi
33
null
1,998
operational
31.7
null
null
INFRA-00072
substation
Bauchi Substation 2
Bauchi
132
null
2,013
operational
368.1
null
null
INFRA-00073
substation
Bauchi Substation 3
Bauchi
132
null
2,023
operational
245.1
null
null
INFRA-00074
substation
Bauchi Substation 4
Bauchi
132
null
2,022
operational
490.5
null
null
INFRA-00075
substation
Bauchi Substation 5
Bauchi
132
null
2,004
under_maintenance
458.9
null
null
INFRA-00076
substation
Bauchi Substation 6
Bauchi
33
null
1,997
operational
408.6
null
null
INFRA-00077
power_plant
Bauchi Hydro Plant 1
Bauchi
null
null
1,997
operational
null
hydro
483.1
INFRA-00078
power_plant
Bauchi Hydro Plant 2
Bauchi
null
null
2,020
operational
null
hydro
76.5
INFRA-00079
power_plant
Bauchi Gas Plant 3
Bauchi
null
null
1,992
operational
null
gas
369.8
INFRA-00080
transmission_line
Bayelsa Transmission Line 1
Bayelsa
132
35.9
2,005
operational
null
null
null
INFRA-00081
transmission_line
Bayelsa Transmission Line 2
Bayelsa
500
133.3
2,004
operational
null
null
null
INFRA-00082
transmission_line
Bayelsa Transmission Line 3
Bayelsa
500
197.5
2,002
operational
null
null
null
INFRA-00083
transmission_line
Bayelsa Transmission Line 4
Bayelsa
132
45.9
2,023
operational
null
null
null
INFRA-00084
transmission_line
Bayelsa Transmission Line 5
Bayelsa
500
187.2
1,997
operational
null
null
null
INFRA-00085
transmission_line
Bayelsa Transmission Line 6
Bayelsa
132
100.3
2,023
operational
null
null
null
INFRA-00086
transmission_line
Bayelsa Transmission Line 7
Bayelsa
500
84.9
2,013
operational
null
null
null
INFRA-00087
substation
Bayelsa Substation 1
Bayelsa
330
null
1,987
planned
90.1
null
null
INFRA-00088
substation
Bayelsa Substation 2
Bayelsa
132
null
2,008
operational
328.4
null
null
INFRA-00089
substation
Bayelsa Substation 3
Bayelsa
330
null
1,996
operational
213.4
null
null
INFRA-00090
substation
Bayelsa Substation 4
Bayelsa
132
null
2,018
operational
146.9
null
null
INFRA-00091
power_plant
Bayelsa Gas Plant 1
Bayelsa
null
null
2,011
operational
null
gas
55.8
INFRA-00092
transmission_line
Benue Transmission Line 1
Benue
132
77.6
1,987
operational
null
null
null
INFRA-00093
transmission_line
Benue Transmission Line 2
Benue
500
192.8
1,999
operational
null
null
null
INFRA-00094
transmission_line
Benue Transmission Line 3
Benue
500
93.2
1,994
operational
null
null
null
INFRA-00095
transmission_line
Benue Transmission Line 4
Benue
500
21.6
2,019
operational
null
null
null
INFRA-00096
transmission_line
Benue Transmission Line 5
Benue
500
102
2,021
operational
null
null
null
INFRA-00097
transmission_line
Benue Transmission Line 6
Benue
132
46.2
2,016
operational
null
null
null
INFRA-00098
substation
Benue Substation 1
Benue
330
null
1,991
operational
491.7
null
null
INFRA-00099
substation
Benue Substation 2
Benue
33
null
1,989
operational
236.9
null
null
INFRA-00100
substation
Benue Substation 3
Benue
33
null
1,997
operational
151.4
null
null
End of preview. Expand in Data Studio

Africa Synth Infrastructure Electricity Grid Infrastructure Nigeria | Africa (World Bank)

Size category: n<1K - Formats: parquet - Sector: energy - Engineered by Electric Sheep Africa

size sector downloads license

TL;DR

This dataset is part of the Electric Sheep Africa catalog on Hugging Face. It is indexed for African data discovery with standardized metadata, loading guidance, provenance notes, and analyst-oriented context.

What This Dataset Covers

Public datasets help analysts inspect structured evidence, build reproducible workflows, and compare patterns across domains.

Dataset context from the existing Hugging Face card: ⚠️ Synthetic dataset — Parameterized from published SSA literature, not real observations. Not suitable for empirical analysis or policy inference. Grid Infrastructure ⚠️ SYNTHETIC DATA DISCLAIMER This dataset contains synthetic/modeled data, not direct measurements. Purpose: Research, education, and methodology demonstration Generation: Geospatial disaggregation model using proxy indicators Validation: Grounded in official World Bank national data Limitations:… See the full description on the dataset page: https://huggingface.co/datasets/electricsheepafrica/africa-synth-infrastructure-electricity-grid-infrastructure-nigeria.

Dataset Profile

Field Value
Hugging Face repo electricsheepafrica/africa-synth-infrastructure-electricity-grid-infrastructure-nigeria
Sector energy
Topic tags nigeria, electricity, energy-access, rural-electrification, synthetic-data, synthetic
Modalities tabular, text
Formats parquet
Size category n<1K
Countries Nigeria
ISO3 coverage NGA
Last modified on HF 2026-04-14 22:33:30+00:00
Inventory snapshot 2026-07-16T16:00:34Z

How To Read This Dataset

  • Start from the repository files and the dataset viewer when available.
  • Treat the README context as a fast orientation layer; confirm variable definitions and units in the data files before modeling.
  • Use explicit country columns when present. When geography is only implied by the title or source metadata, document that assumption in downstream analysis.
  • Preserve missing values until you have a defensible imputation rule.

Usage

from datasets import load_dataset

ds = load_dataset("electricsheepafrica/africa-synth-infrastructure-electricity-grid-infrastructure-nigeria")
print(ds)

split_name = next(iter(ds))
table = ds[split_name]
print(table.features)
print(table[:3])

Convert To Pandas When Tabular

from datasets import Dataset

first_split = ds[next(iter(ds))]
if isinstance(first_split, Dataset):
    df = first_split.to_pandas()
    print(df.head())

Data Quality Notes

  • This card was standardized from the Electric Sheep Africa Hugging Face metadata inventory.
  • Exact schema, row counts, and source files should be inspected in the repository data files.
  • Metadata gaps from the inventory: upstream_publisher.
  • Do not infer policy meaning from labels alone; confirm definitions, units, and methods in the source material.

Source And Provenance

Suggested Analyses

  • Inspect schema and missingness before modeling.
  • Profile variables by geography, time, and subgroup columns where present.
  • Join with other Electric Sheep Africa datasets using explicit country, year, and indicator fields when available.
  • Build reproducible notebooks that cite both the original source context and the Electric Sheep Africa Hugging Face repo.

Citation

@misc{electric_sheep_africa_africa_synth_infrastructure_electricity_grid_infrastructure_nigeria_2026,
  title        = {Africa Synth Infrastructure Electricity Grid Infrastructure Nigeria | Africa (World Bank)},
  author       = {World Bank open data},
  year         = {2026},
  url          = {https://huggingface.co/datasets/electricsheepafrica/africa-synth-infrastructure-electricity-grid-infrastructure-nigeria},
  publisher    = {Hugging Face Datasets, engineered by Electric Sheep Africa},
  howpublished = {\url{https://huggingface.co/datasets/electricsheepafrica/africa-synth-infrastructure-electricity-grid-infrastructure-nigeria}}
}

License

Released under mit.

Original source rights remain with the original publisher or data provider. Electric Sheep Africa engineering standardizes discovery metadata, documentation, and usage guidance for analysis on Hugging Face.

About Electric Sheep Africa

Electric Sheep Africa publishes ML-ready African public datasets on Hugging Face.


Provenance: metadata-backed README standardized 2026-08-12 by the Electric Sheep Africa README system. Inventory source: catalog/esa_metadata_inventory/master_metadata.jsonl.

Downloads last month
42

Collections including electricsheepafrica/africa-synth-infrastructure-electricity-grid-infrastructure-nigeria